Optimising your energy consumption has never been easier than with fhalcon® energy. Thanks to the individually configurable dashboard, you can maintain an overview of the production process at all times, immediately identify energy-intensive processes and benchmark against other production sites.
 basics
The foundation and starting point for all fhalcon® modules is always the master data. The most important data for fhalcon® energy includes:
- The creation and copying of machines, components and structuring nodes
 - Clear presentation as a tree structure
 - Free assignment, maintenance and allocation of characteristics
 - Addition of links to, for example,
- Technical documents
 - Component drawings
 - Replacement part lists
 - Websites
 
 - Full-text search within the master data
 - First delivery is done with templates and master data of all drives from the visualisation(fhalcon® visualization)
 - Comparison of master data
 - Free assignment, maintenance and allocation of price lists in the consumption unit, for example
- Electricity
 - Gas
 - Fuel oil
 
 - Parametrisation of the drive-related operating data acquisition for the following data
- Runtime
 - Energy
 - Process reference
 
 
Master data for identical machines can be maintained with a template. This ensures simple, quick and effective maintenance of components, characteristics and energy sources.
- Automatic master data maintenance by inheriting the template for this type of machine
- Components
 - Characteristics
 - Maintenance
 
 - Customisation of the machine through modifications to inherited data
 - Template-related allocation of energy sources
 
Let the system take care of your energy monitoring. All energy data is determined and saved in relation to the drive and the processes.
- Drive-related allocation of energy meters
 - Process-related saving of energy consumption
 - Display of the average consumption of the machine
 - Formula editor
 - Storing of formulas for the process and time-related distribution of non-drive-related energies
 - Storing of factors for drive-related weighting of distributed energies
 - Area-related diagram display on the start screen
- Energy
 - Runtime
 
 - Top 10 list for energy or runtime
 - Energy storage and evaluation
- Machine-related
 - Area-related (fhalcon® import, production and export)
 - Process-related (fhalcon® import, production and export)
 
 - Product-related evaluation and comparison of energy consumption, tonnage, runtimes and output
 - Determination and representation of the energy consumption in kWh and kWh/t
 - Determination and representation of energy costs in € and €/t based on price lists
 - Day and area-related overall view with the following key figures: t, kWh, kWh/t, €, €/t
 
The process-related logging of machine runtimes takes your system optimisation to a new level.
- Process-related saving of the running and occupancy times of each drive / each machine
 - Representation and comparison of the actual runtimes and the time, for which the drive was reserved for a process
 - Process-related evaluation of the drives involved
 - Subsequent analysis of the drives used for a process / lot (fhalcon® import, production and export)
 - Display and filtering of additional process-related values (fhalcon® import, production and export)
 - Subsequent analysis and display on a timeline with switchable filters
- Process and batch-related
 - Drive-related
 - Step-related
 
 - Display of process details incl. energy consumption
 
All the recorded energy data, machine data, components and characteristics can be evaluated, exported or automatically emailed by our powerful statistics module.
Evaluation options:
- Machines
 - Components
 - Operating data overview
 - Operating data log
 - Energy data incl. costs (fhalcon® import, production and export)
- Storage and transfer
 - Mixing plant
 - Pressing plant
 - Loading
 - Without reference
 - Totals
 
 - Production data incl. energy and costs (fhalcon® import, production and export)
- Acceptance
 - Transfer
 - Mixing plant production
 - Pressing plant production
 - Mixing / pressing plant production
 - Loading
 
 
Statistics functions:
- Flexibly configurable
 - Filter, group and sort within lists
 - Display or hide columns
 - Adjust the width and order of the columns
 - Totals and subtotals
 - User / workstation-related, freely configurable list layouts
 - Direct export to Excel or other formats
 
options
Automatic emailing of logs, lists and statistics.
- Automatic emailing
- Energy data / energy consumption lists incl. costs
 - Production data incl. energy consumption and costs
 - Operating data logs
 
 - Integration into the on-site system structure
 - Integration into the on-site email system
 - Sending of emails from the programmes
 - Automated, time-controlled sending of emails with attachments
 
screens